Skip to Content

Image for illustration only. It may show a product series rather than the exact product offered.

6061T6 Aluminum Tube 3/4X.049 - 12 Foot

https://www-old.roctexo.com/web/image/product.template/103438/image_1920?unique=b31dcc7
Part numbers : RX1-03-36200-12 , LONG LEAD , 03-36200-12
Unit of Measure: EA

169.10 EUR / EA 169.1 EUR 169.10 € excl. VAT

169.10 EUR / EA excl. VAT

Not Available For Sale

This combination does not exist.

Availability
Up to 5 EA ready to ship on Monday 2026-11-16
Order before 17:00 CET on Friday 2026-11-13
Up to 7 EA ready to ship on Thursday 2026-11-19
Order before 17:00 CET on Friday 2026-11-13

6061-T6 aluminium round tube supplied in a 3.66 m length. This tubing provides a nominal 19.1 mm outside diameter with a 1.2 mm wall thickness and approximately 16.6 mm inside diameter.

  • Material: 6061-T6 aluminium
  • Profile: round tube
  • Outside diameter: 19.1 mm
  • Wall thickness: 1.2 mm
  • Inside diameter: approximately 16.6 mm
  • Supplied length: 3.66 m
  • Roctexo part number: RX1-03-36200-12

Suitable for purchasing and material-planning requirements where 6061-T6 round aluminium tubing in this nominal size is specified. Verify material, dimensional and regulatory requirements for the intended application before use.

Orders with purchased items below 100.00 € incur a small order fee of 10.00 €. Both amounts exclude VAT. Shipping, other fees and core deposits do not count towards the limit.

These products might also be of interest

Your Dynamic Snippet will be displayed here... This message is displayed because you did not provided both a filter and a template to use.
Your Dynamic Snippet will be displayed here... This message is displayed because you did not provided both a filter and a template to use.