Skip to Content

Image for illustration only. It may show a product series rather than the exact product offered.

6061T6 Aluminum Tube 3/4X.049 - 1 Foot

https://www-old.roctexo.com/web/image/product.template/38402/image_1920?unique=57cde3d
Part numbers : RX1-03-36200-1 , LONG LEAD , 03-36200-1
Unit of Measure: EA

14.59 EUR / EA 14.59 EUR 14.59 € excl. VAT

14.59 EUR / EA excl. VAT

Not Available For Sale

This combination does not exist.

Availability
Up to 71 EA ready to ship on Monday 2026-11-16
Order before 17:00 CET on Friday 2026-11-13
Up to 99 EA ready to ship on Thursday 2026-11-19
Order before 17:00 CET on Friday 2026-11-13
1 EA available on request, inbound freight fee of 60 EUR applies
Special order from vendor stock.

6061-T6 aluminium round tube supplied as a 304.8 mm (1 ft) length for general fabrication, repair and maintenance material requirements.

  • Material: 6061-T6 aluminium
  • Outside diameter: 19.1 mm (3/4 in)
  • Wall thickness: 1.25 mm (0.049 in)
  • Inside diameter: approximately 16.6 mm (0.652 in)
  • Supplied length: 304.8 mm (1 ft)
  • Roctexo part number: RX1-03-36200-1

Please verify the required dimensions and material specification against the applicable maintenance data or engineering requirements before use.

Orders with purchased items below 100.00 € incur a small order fee of 10.00 €. Both amounts exclude VAT. Shipping, other fees and core deposits do not count towards the limit.

These products might also be of interest

Your Dynamic Snippet will be displayed here... This message is displayed because you did not provided both a filter and a template to use.
Your Dynamic Snippet will be displayed here... This message is displayed because you did not provided both a filter and a template to use.